首页> 外文期刊>Marine Structures >A new proposal for an offshore wind foundation for transitional waters
【24h】

A new proposal for an offshore wind foundation for transitional waters

机译:过渡水域海上风电基础的新建议

获取原文
获取原文并翻译 | 示例
           

摘要

Offshore wind energy is a renewable source with strong prospects of development, allowing both the reduction of greenhouse gas emissions and the promotion of technological progress. Nowadays, the top technological solution used in offshore wind foundations is the monopile, with a market share of more than 80%, due to its low-cost when compared to other technologies. Still, its use is limited to shallow waters (depths up to 30 m). Therefore, and for higher depths, other types of foundations should be considered. The authors of this work present a foundation concept for transitional waters with self-floating capability and suction pile embedment. This foundation is formed by a tripod, a transition piece and a variable number of floaters and the respective suction pile. The structure is self-floating and is transported to the installation site aided by tugboats. Under these circumstances, buoyancy and stability of the entire structure must be ensured. The suction piles can also be filled with air during port logistics, through reduction of the necessary port draft. When the structure arrives at the installation site, it submerges by filling the floaters, and the suction piles guarantee the correct attachment to the seabed. Regarding the developed structure, a modal analysis was made to compute its natural frequencies and mode shapes. Moreover, the structure behavior during transportation is evaluated using AQWA tools. The developed foundation was then validated for a certain number of cases defined by the current DNV-GL standard.
机译:海上风能是一种可再生能源,具有广阔的发展前景,既可以减少温室气体排放,又可以促进技术进步。如今,海上风电基金会使用的顶级技术解决方案是单体桩,由于与其他技术相比价格低廉,因此其市场份额超过80%。尽管如此,它的使用仅限于浅水区(深度不超过30 m)。因此,对于更高的深度,应考虑其他类型的基础。这项工作的作者提出了具有自浮能力和吸力桩嵌入的过渡水的基础概念。该基座由三脚架,过渡件,可变数量的浮子和相应的吸水桩组成。该结构是自动浮动的,并在拖船的帮助下运输到安装地点。在这种情况下,必须确保整个结构的浮力和稳定性。通过减少必要的港口吃水,在港口物流过程中也可以在吸管中充满空气。当结构到达安装现场时,它会通过填充浮子而浸入水中,并且吸力桩确保正确连接到海底。关于开发的结构,进行了模态分析以计算其固有频率和模态形状。此外,使用AQWA工具评估运输过程中的结构行为。然后,针对当前DNV-GL标准定义的一定数量的案例对开发的基础进行了验证。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号