首页> 外文期刊>Marine Log >Navy gets tougher on LCS affordability
【24h】

Navy gets tougher on LCS affordability

机译:海军对LCS的负担能力变得更加严格

获取原文
获取原文并翻译 | 示例
       

摘要

The U.S. Navy is to down select between the two Littoral Combat Ship (LCS) designs in fiscal 2010. The current LCS seaframe construction solicitation will be cancelled and a new one issued. At down select, a single prime contractor and shipyard will be awarded a fixed price incentive contract for up to 10 ships with two ships in fiscal 2010 and options through fiscal 2014. This decision was reached after careful review of the fiscal 2010 industry bids, consideration of total program costs, and ongoing discussions with Congress.
机译:美国海军将于2010财年在两种滨海战斗舰(LCS)设计之间进行选择。目前的LCS机身建造招标将被取消,并发布新的招标书。如果选择不当,将在2010财年授予单个总承包商和船厂多达10艘船的固定价格激励合同,并在2014财年之前授予两艘船的选择权。该决定是在仔细审查了2010财年行业投标之后得出的,计划总费用,以及与国会的持续讨论。

著录项

  • 来源
    《Marine Log》 |2009年第10期|15|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:42:27

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号