首页> 外文期刊>Manufacturing and service operations management >Some Lessons on Operations Management Model Implementation Drawn from the RAND Fire Project
【24h】

Some Lessons on Operations Management Model Implementation Drawn from the RAND Fire Project

机译:兰德消防项目中有关实施运营管理模型的一些经验教训

获取原文
获取原文并翻译 | 示例
           

摘要

This article examines the contributions and historical context of the fire project that was undertaken in the early 1970s by the New York City-RAND Institute on behalf of the New York City Fire Department. We identify a number of technical and nontechnical factors that contributed to the high impact of this operations modeling effort. We hypothesize that these factors, though derived from the experiences in a particular public sector engagement, are applicable to other large-scale operations modeling efforts. This invited contribution is based on the author's inaugural Manufacturing and Service Operations Management (MSOM) Distinguished Fellows address that was given at the June 2011 MSOM conference at the University of Michigan.
机译:本文研究了纽约市兰德学院在1970年代初代表纽约市消防局进行的消防项目的贡献和历史背景。我们确定了许多技术和非技术因素,这些因素对这一运营建模工作的巨大影响做出了贡献。我们假设这些因素尽管是从特定的公共部门参与中获得的经验得出的,但也适用于其他大规模运营建模工作。此邀请的贡献是基于作者在密歇根大学2011年6月MSOM会议上发表的就职制造与服务运营管理(MSOM)杰出研究员的演讲。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号