WHAT WE'VE BEEN WAITING FOR... EDINBURGH'S ALMOST READY TO ROLL

机译:我们已经在等待什么...爱丁堡几乎准备就绪

获取原文
获取原文并翻译 | 示例
           

摘要

Monday 2 December 2013 was a landmark date in Edinburgh as the first modern tram inched its way into the heart of the Scottish capital. In just four months time, the political frenzy, the years of contractual disputes and a hefty bill of GBP776m (approx. EUR927m) for 14.4km (8.7 miles) of line with 16 stops will hopefully be pushed to the back of our minds when regular operations commence between the city centre and Edinburgh Airport. It's so far, so good with the trial running, initially carried out in the early morning hours to avoid road traffic. In addition to familiarising tram crews and operational staff before the full service can be implemented, the system is undertaking emergency exercises, and technical and infrastructure tests to make sure everything goes smoothly from day one.
机译:2013年12月2日星期一是爱丁堡的一个里程碑式的日子,这是第一辆现代电车驶入苏格兰首都心脏地带。在短短四个月的时间里,政治狂潮,多年的合同纠纷以及长达14.4公里(8.7英里),16个停靠点的7.76亿英镑(约9.27亿欧元)巨额账单有望在我们常规时被抛诸脑后在市中心和爱丁堡机场之间开始运营。到目前为止,试运行很好,最初是在清晨进行,以避免道路交通。除了在全面服务实施之前使电车乘员和运营人员熟悉之外,该系统还进行了紧急演习以及技术和基础设施测试,以确保从第一天起一切都能顺利进行。

著录项

  • 来源
    《Tramways & Urban Transit》 |2014年第914期|57-60|共4页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号