...
【24h】

HBLR AND 8TH STREET

机译:HBLR和第八街

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The final 1.5km (one-mile) extension of the Hudson-Bergen Light Rail (HBLR) opened in January 2011, taking the southernmost segment of the line out to 8th Street in Bayonne. On leaving the previous terminus at 22nd Street the line becomes single-track running parallel with a freight line and freight sidings. These in turn are parallel with the Highway 440 freeway and Avenue E; as the line approaches Broadway it rises to an elevated alignment on the approach to the 8th Street terminus. Here the line becomes double-track as it approaches the still elevated station platforms. The station has all the usual North American light rail facilities, including lifts to street level, but is differentiated with a very unusual street-level facade based upon the design of the original Central Railroad of New Jersey station that occupied the site and closed in the late 1970s. The station has a small car park and bus connections are a short walk away; beyond the station are a turnback and storage sidings. The total extension project cost around USD100m -main construction was carried out under a USD58.4m contract with George Harms Construction of Howell, NJ - and completes the current phase of HBLR development.
机译:哈德逊-伯根轻轨(HBLR)的最后1.5公里(一英里)延长线于2011年1月开放,将线路的最南端延伸至巴约讷的第8街。离开上一个终点站在22街时,该线路将变成一条单线,与货运线和货运壁板平行。这些又与440号高速公路和E大街平行;随着线的接近百老汇,它上升到第八街终点站的高架路线。这条线路在接近仍然高架的站台时变成双轨。该车站拥有北美所有常规的轻轨设施,包括通往街道的升降机,但其独特的街道立面却与众不同,其基础是占据该地点并在地铁中封闭的新泽西州原始中央铁路车站的设计。 1970年代后期。该车站有一个小型停车场,距离巴士站仅几步之遥。车站外是翻折和储物壁板。扩建项目总成本约为1亿美元-主要建设项目是与新泽西州Howell的George Harms Construction签订了5,840万美元的合同-并完成了HBLR开发的当前阶段。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号