...
首页> 外文期刊>Tramways & Urban Transit >Bombardier marks SSL milestone
【24h】

Bombardier marks SSL milestone

机译:庞巴迪标志着SSL里程碑

获取原文
获取原文并翻译 | 示例

摘要

Friday 18 December saw the 1395th and final carriage of the GBP1.5bn S Stock order for the London Underground presented at Bombardier's facility in Derby. The intermediary car is the last in a delivery schedule that dates back to 2009. The final train will undergo testing before entering service in the second half of 2016. In total, the firm is supplying 191 trains for the Metropolitan, District, Hammersmith & City and Circle lines, which make up around 40% of the network. The build consisted of 58 eight-car S8 units for the Metropolitan line and 133 seven-car S7 units for the Circle, District and Hammersmith & City lines.
机译:12月18日,星期五,庞巴迪公司在德比的工厂提出了伦敦地铁的15亿英镑S股订单的第1395次,也是最后的运输。中间车是交付时间表中可追溯到2009年的最后一辆车。最后一列火车将在2016年下半年投入服务之前进行测试。该公司总共为大都会,区,哈默史密斯和城市提供191列火车。和圆形线,约占网络的40%。建造包括用于都市线的58辆八车S8单元和用于Circle,District和Hammersmith&City线的133七车S7单元。

著录项

  • 来源
    《Tramways & Urban Transit 》 |2016年第938期| 45-45| 共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号