首页> 外文期刊>Land and water >Imposing Highway Challenges Solved with New Innovations
【24h】

Imposing Highway Challenges Solved with New Innovations

机译:用新的创新解决高速公路挑战

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Environmentally sensitive wetlands, steep slopes and erosion-prone water channels were the challenges facing officials with the South Carolina Department of Transportation when they began building Highway 290, a new, four-lane highway near Spartanburg, South Carolina, in the early months of 2005. With strict NPDES Phase Ⅱ regulations mandating minimal sediment leaving construction sites, more traditional methods of erosion control, such as tacked straw, were deemed inappropriate to handle the 2H:1V slopes. In order to stay within the tight NPDES Phase Ⅱ tolerances, highway officials needed to find alternative solutions for the challenging project.
机译:对环境敏感的湿地,陡峭的山坡和易受侵蚀的水道是南卡罗来纳州交通部官员在2005年初开始在南卡罗来纳州的斯巴达堡附近建造290号公路(四车道的新公路)时面临的挑战。 。严格的NPDES阶段Ⅱ法规规定了最少的泥沙离开建筑工地,更传统的侵蚀控制方法(例如粘稻草)被认为不适用于处理2H:1V斜坡。为了保持在NPDESⅡ严格的公差范围内,公路官员需要为具有挑战性的项目寻找替代解决方案。

著录项

  • 来源
    《Land and water》 |2006年第3期|p.12-14|共3页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 农业科学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号