首页> 外文期刊>NZTA research >Extending pavement life: investigation of premature distress in unbound granular pavements
【24h】

Extending pavement life: investigation of premature distress in unbound granular pavements

机译:延长路面寿命:调查未粘结颗粒路面中的过早困扰

获取原文
获取原文并翻译 | 示例
           

摘要

Premature distress in unbound basecourses has occurred regularly in New Zealand. In 2008, the NZ Transport Agency (NZTA) commissioned the assembly of an inventory of problem basecourses and subbases. Study of the inventory found that the long-term degree of saturation of basecourse was highly significant in the case histories of premature distress, ie the pavements failed through shear instability (shoving) in the basecourses. A common feature in basecourses with a high degree of saturation was gap grading in the sand fraction.
机译:新西兰经常发生未受约束的基础设施过早遇险的情况。 2008年,新西兰运输局(NZTA)委托组装问题基地和子基地清单。对清单的研究发现,在过早遇险的历史中,基层的长期饱和度非常重要,即路面由于基层的剪切不稳定性(推挤)而失效。饱和度较高的基层的一个共同特征是砂级分中的间隙分级。

著录项

  • 来源
    《NZTA research》 |2011年第14期|p.11|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号