首页> 外文期刊>KSCE journal of civil engineering >Impact of Unused Life for Track Sections and Available Workforce in Scheduling Tamping Actions on Ballasted Tracks
【24h】

Impact of Unused Life for Track Sections and Available Workforce in Scheduling Tamping Actions on Ballasted Tracks

机译:空载寿命对轨道部分和可用劳动力在压载轨道上计划捣固动作的影响

获取原文
获取原文并翻译 | 示例
           

摘要

This paper presents an optimization model for the problem of optimal scheduling of tamping actions on ballasted tracks. The model extends an existing one in the literature by including the unused life costs for track sections in the objective function and introducing available workforce constraints in the model. The aim is to obtain an optimal schedule for tamping actions minimizing the total cost in a finite time horizon using global optimization. The results of numerical study show that consideration of track layout in the problem leads to a significant increase in the total number of tamping actions and the amount of unused life for track sections. It is also found that it is important to use a big value for available workforce in the problem in order to reduce the total cost. The proposed model presents a more realistic solution for the studied problem than the existing work in the literature.
机译:本文针对压载轨道上的捣固动作的最佳调度问题提出了一种优化模型。通过在目标函数中包括轨道部分的未使用生命成本,并在模型中引入可用的劳动力约束,该模型扩展了文献中的现有模型。目的是获得使用全局优化在有限的时间范围内最小化总成本的捣固行动的最佳时间表。数值研究结果表明,在问题中考虑轨道布局会导致夯实动作的总数和轨道部分的未使用寿命大大增加。还发现重要的是,在问题中使用较大的可用劳动力价值以降低总成本。与文献中的现有工作相比,所提出的模型为研究的问题提供了更现实的解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号