Uncertain Time-Resource-Cost Trade-Off Models for Construction Project Schedule

机译:施工项目时间表的不确定时间 - 成本折衷模型

获取原文
获取原文并翻译 | 示例

摘要

Construction project schedule is to bring the completion time and the total cost into balance by allocating resources. In order to shorten the completion time and decrease the total cost as far as possible, three time-resource-cost trade-off models for construction project under uncertain environment, including expected value (E-V) model, chance-constrained (C-C) model and chance maximization (C-M) model, were built by using uncertain theory. The duration time of activities, the allocation time of material resources and human resources are considered as uncertain variables in the three models. The E-V model was to shorten the expected completion time under the chance constraint of cost. The C-C model was to obtain the minimum completion time under the chance constraints of completion time and cost. The C-M model was to maximize the chance that the completion time is not lager than the due date under the chance constraint of cost. For the convenience of calculation, the three models were changed into crisp equivalent form. A practical case study was provided to show the application process of three models and the results can be obtained by using the genetic algorithm. Finally, some extended construction project scheduling models are introduced.
机译:建设项目时间表是通过分配资源来实现完工时间和总成本。为了缩短完成时间并尽可能减少总成本,在不确定环境下建筑项目的三个时间 - 成本折衷模型,包括预期值(EV)模型,机会约束(CC)模型通过使用不确定的理论建造机会最大化(CM)模型。活动的持续时间,材料资源和人力资源的分配时间被认为是三种模型中的不确定变量。 E-V型号是缩短成本的机会限制下的预期完成时间。 C-C型号是在完成时间和成本的机会限制下获得最低完成时间。 C-M模型是最大限度地提高完成时间不会比在成本的机会限制下的截止日期的可能性。为了便于计算,三种模型被改为酥脆等效形式。提供了一种实际的案例研究以显示三种模型的应用过程,并且可以通过使用遗传算法来获得结果。最后,介绍了一些扩展建设项目调度模型。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号