Interaction and Treatment for Tunnels Orthogonally Traversing Large Bedrock Landslides

机译:隧道正交穿越大型基岩山体滑坡的互动和治疗

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

When a tunnel orthogonally traverses a large bedrock landslide, the interaction between the tunnel and the bedrock can easily disturb the stability of the slope and deformation of tunnel structures. In this work, Jimei tunnel in southwest China was studied as an example. The physical parameters of the landslide were inverted based on uniform design and a radial basis function neural network model and a model was established for the interaction of tunnel and bedrock landslide. Simulations showed that tunnel construction resulted in tensile failure at the trailing edge of bedrock landslide and clear deformation in the left line of the tunnel. This was consistent with the field damage observed in this work. A comparative analysis was performed of structural stability after the application of three schemes of earth-rock clearing, load-reducing, and slide-resistant pile arrangements. Optimal measures for landslide reinforcement were determined to ensure smooth tunnel construction and reduce project cost. Two years of continuous post-construction monitoring indicated that the stability of tunnel and landslide was preserved and treatment goal was achieved. Calculation methods and control measures developed in the current research for tunnels orthogonally traversing bedrock landslides provided a useful reference for similar projects in the future.
机译:当隧道正交穿过大型基岩滑坡时,隧道和基岩之间的相互作用可以容易地干扰隧道结构的斜坡和变形的稳定性。在这项工作中,中国西南隧道作为一个例子进行了研究。基于统一的设计,岩石滑坡的物理参数倒置,并且建立了径向基函数神经网络模型和模型,用于隧道和基岩滑坡的相互作用。模拟表明,隧道施工导致支架滑坡后缘的拉伸失效,并在隧道左侧清晰变形。这与在这项工作中观察到的田间伤害一致。在施加三种地球岩石清洁,减小和滑动桩布置方案之后,对结构稳定进行了比较分析。确定了山体滑坡加固的最佳措施,以确保平稳的隧道施工,降低项目成本。两年的持续后施工监测表明,保存了隧道和滑坡的稳定性,实现了治疗目标。目前对隧道正交穿越基岩滑坡开发的计算方法和控制措施为未来类似项目提供了有用的参考。

著录项

  • 来源
    《KSCE journal of civil engineering》 |2021年第7期|2758-2769|共12页
  • 作者单位

    Southwest Jiaotong Univ Sch Civil Engn Chengdu 610031 Peoples R China|Sichuan Highway Planning Survey Design & Res Inst Chengdu 610031 Peoples R China;

    Southwest Jiaotong Univ Sch Civil Engn Chengdu 610031 Peoples R China|Sichuan Highway Planning Survey Design & Res Inst Chengdu 610031 Peoples R China;

    Sichuan Highway Planning Survey Design & Res Inst Chengdu 610031 Peoples R China;

    Sichuan Highway Planning Survey Design & Res Inst Chengdu 610031 Peoples R China;

    Sichuan Highway Planning Survey Design & Res Inst Chengdu 610031 Peoples R China;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Tunnel; Landslide; Interaction; Treatment measure; Calculation method;

    机译:隧道;滑坡;相互作用;治疗措施;计算方法;