首页> 外文期刊>日本建築学会计画論文集 >Man-Hour Survey And Analysis of The Labor Productivity Of On-Site Work Using The Reinforced Precast Concrete Frame Method Survey and study of labor productivity of the reinforced precast concrete frame method (Part 1)
【24h】

Man-Hour Survey And Analysis of The Labor Productivity Of On-Site Work Using The Reinforced Precast Concrete Frame Method Survey and study of labor productivity of the reinforced precast concrete frame method (Part 1)

机译:用钢筋混凝土预制框架方法进行现场工作的劳动生产率调查和分析钢筋混凝土预制框架方法的劳动生产率调查和研究(第1部分)

获取原文
获取原文并翻译 | 示例
       

摘要

The author has developed and improved some construction methods by reinforced precast concrete (RPC) in almost two decades. This paper described the results of long study on the labor productivity based on the author's experiences. The summary of this study as followed: (1) Difference between labor productivity of on-site work using the RPC method and conventional methods (2) Relationship of labor productivity to the structural method used with the RPC method (3) Actual precast concrete member ratio in the RPC method (4) Relationship of precast concrete member ratio with labor productivity
机译:作者在近二十年来开发并改进了钢筋混凝土预制(RPC)的一些施工方法。本文根据作者的经验描述了长期研究劳动生产率的结果。本研究的概述如下:(1)使用RPC方法的现场工作的劳动生产率与传统方法之间的差异(2)劳动生产率与RPC方法所使用的结构方法之间的关系(3)实际预制混凝土构件RPC法中的比率(4)预制混凝土构件比率与劳动生产率的关系

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号