...
首页> 外文期刊>Journal of Volcanology and Geothermal Research >Forecasting eruptions after long repose intervals from accelerating rates of rock fracture: The June 1991 eruption of Mount Pinatubo, Philippines
【24h】

Forecasting eruptions after long repose intervals from accelerating rates of rock fracture: The June 1991 eruption of Mount Pinatubo, Philippines

机译:从岩石破裂的加速速率预测在较长的休止间隔后的爆发:1991年6月菲律宾皮纳图博火山爆发

获取原文
获取原文并翻译 | 示例

摘要

Mount Pinatubo, Philippines erupted on 7th June 1991, after 500 years of repose and two months of detected seismic unrest. Accelerating volcano-tectonic (VT) earthquake rates in the final days before this eruption have previously been used to develop eruption forecasting models based on extension and coalescence of fractures in the volcanic edifice forming a new pathway for magma ascent to the surface. Here, the precursory acceleration in VT earthquake rates is re-analysed with these forecasting models to test their accuracy and sensitivity to how the VT earthquake data are gathered. Binning the data into fixed VT number intervals rather than fixed time intervals gives more precise forecasts, but gives a 'forecast' 24 hours before the eruption began. This is interpreted as the forecast time indicating when the new magma conduit formed. The continued high rate of VT seismicity in the final day before the magma reached the surface is interpreted as widening of the conduit and friction between the magma and country rock during magma ascent.
机译:菲律宾的皮纳图博火山(Mount Pinatubo)在经过500年的安息和两个月的地震动荡后于1991年6月7日爆发。在火山喷发之前的最后几天,加速火山构造(VT)地震的速度已被用来建立火山喷发预测模型,该模型基于火山构造中裂缝的扩展和合并,形成了岩浆上升至地表的新途径。在此,使用这些预测模型重新分析了VT地震发生率的前兆加速度,以测试其对VT地震数据收集方式的准确性和敏感性。将数据分为固定的VT号间隔而不是固定的时间间隔,可以提供更精确的预测,但是在喷发开始前24小时提供“预测”。这被解释为指示新岩浆导管何时形成的预测时间。在岩浆到达地表之前的最后一天,VT地震活动的持续高速率被解释为岩浆上升期间岩浆与乡村岩石之间的导管变宽和摩擦。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号