Full Closure or Partial Closure? Evaluation of Construction Plans for the 1-5 Closure in Downtown Sacramento

机译:全封闭还是部分封闭?萨克拉曼多市区1-5号封闭工程的建设计划评估

获取原文
获取原文并翻译 | 示例
           

摘要

Three alternative construction plans with full highway closures and limited capacity closures (partial closures) are evaluated for a large-scale freeway reconstruction project in the Sacramento metropolitan area. By using a dynamic network analysis tool, the potential impact resulting from different construction plans is estimated and analyzed measured by changes in total demand, travel delays, vehicle miles/hours traveled (VMT/VHT), fuel consumptions, and emissions. The results show that, for this Interstate 5 closure, if only user delay costs are considered, the actual full closure plan is the best. It produces considerably less total system travel delay than the two partial closure plans although it closed more lanes. This plan, however, may induce more VMT than the other two. In fact, the other two partial closure plans produce slightly fewer emissions and consume slightly less fuel. The outcome of which plan comes out on top crucially depends on two other factors, besides the chosen objective: the amount of demand reduction a plan induces and the availability of alternative routes to divert traffic away from the work zone area. Developing efficient demand management measures will be the key to improving the network performance and to reduce the emissions. Moreover, when data are available, construction costs and emissions produced by construction activities should also be included in the evaluations, in addition to the user costs considered in this study.
机译:针对萨克拉曼多都会区的大型高速公路改造项目,评估了三个具有全部公路封闭和有限容量封闭(部分封闭)的替代建设计划。通过使用动态网络分析工具,可以根据总需求,旅行延误,行驶的车辆英里数/小时数(VMT / VHT),燃料消耗和排放量的变化来估算和分析由不同施工计划产生的潜在影响。结果表明,对于这种5号州际公路关闭,如果仅考虑用户延误成本,则实际的完全关闭计划是最佳的。尽管关闭了更多车道,但与两个部分关闭计划相比,它产生的总系统行程延迟要少得多。但是,该计划可能会比其他两个方案产生更多的VMT。实际上,其他两个部分关闭计划产生的排放量稍少,消耗的燃料也略少。计划的最终结果除其他目标外,还取决于其他两个因素:计划导致的需求减少量以及替代路线的可用性,以将交通从工作区转移出去。制定有效的需求管理措施将是改善网络性能和减少排放的关键。此外,当可获得数据时,除本研究中考虑的用户成本外,评估中还应包括建筑活动产生的建筑成本和排放。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号