首页> 外文期刊>Journal of Transportation Engineering >Traffic Volume Benchmarks for Major Arterial Widening versus Expressway Construction: Exploratory Approach
【24h】

Traffic Volume Benchmarks for Major Arterial Widening versus Expressway Construction: Exploratory Approach

机译:主要干线拓宽与高速公路建设的交通量基准:探索性方法

获取原文
获取原文并翻译 | 示例
           

摘要

There exist several classes of physical interventions to address congestion at arterials, including widening (construction of additional lanes) and upgrading to expressway standards where possible. For each class of intervention, a key question is the threshold or benchmark traffic volume (BTV) at which the intervention is feasible. For long-term congestion mitigation planning for multiple arterial sections in a network and for planning-phase corridor development, agencies desire to identify BTVs for congestion mitigation interventions. The existing literature addresses this issue largely in feasibility analysis for specific projects, with little or no guidance regarding network-level planning considerations. In addressing this gap, this paper presents a detailed network-level planning methodology that is rooted in economic efficiency. The methodology first establishes three basic alternatives-Do-Nothing, Widening, and Upgrade-to-Expressway-and expresses the total lifecycle cost for each alternative as a function of the current traffic volume in terms of average daily traffic (ADT). The BTV is identified as the ADT at which the lifecycle costs of any two alternatives are equal. This paper demonstrates the application of the proposed methodology using data from in-service roads, and the results indicate that the relative weights assigned to the agency and user costs significantly influence the BTVs. In addition, results are presented for the scenario where these two cost categories are assigned equal weights; for this scenario, widening is never the best option. In the probabilistic situation, it is found that, at an 80% confidence level, it is economically attractive to upgrade a four-lane major arterial to an expressway when the ADT reaches 6,000; at the 100% confidence level, it is economically attractive to upgrade to an expressway when the ADT reaches 19,000. (C) 2017 American Society of Civil Engineers.
机译:有几种物理干预措施可解决动脉拥堵问题,包括加宽(修建额外的车道)和在可能的情况下升级到高速公路标准。对于每种干预措施,一个关键问题是干预措施可行的阈值或基准流量(BTV)。对于网络中多个动脉段的长期拥堵缓解计划以及规划阶段的走廊开发,各机构希望确定BTV用于缓解拥堵干预措施。现有文献主要在针对特定项目的可行性分析中解决了这个问题,而很少或没有关于网络级规划考虑的指导。为了弥补这一差距,本文提出了一种基于经济效率的详细网络级计划方法。该方法首先建立了三个基本的替代方案-不做,加宽和升级至高速公路-并根据平均日流量(ADT)将每个替代方案的总生命周期成本表示为当前流量的函数。 BTV被标识为ADT,在该处,任何两个替代方案的生命周期成本都相等。本文使用在役道路上的数据演示了所提出方法的应用,结果表明,分配给代理商和用户成本的相对权重会显着影响BTV。此外,还为这两个成本类别分配了相同的权重的情况提供了结果。在这种情况下,扩展永远不是最好的选择。在概率情况下,发现在80%的置信度下,当ADT达到6,000时,将四车道的主干道升级为高速公路在经济上具有吸引力。如果置信水平为100%,则当ADT达到19,000时,升级到高速公路在经济上具有吸引力。 (C)2017年美国土木工程师学会。

著录项

  • 来源
    《Journal of Transportation Engineering》 |2017年第8期|04017040.1-04017040.12|共12页
  • 作者单位

    Changan Univ Sch Highway Middle Sect South 2nd Ring Rd Xian 710064 Shaanxi Peoples R China;

    Natl Univ Sci & Technol Natl Inst Transportat H-12 Islamabad Pakistan;

    Purdue Univ 550 Stadium Mall Dr W Lafayette IN 47907 USA;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号