...
【24h】

PERFORMANCE ASSESSMENT OF RAIN GARDENS

机译:防雨花园的性能评估

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The most widely used approach for evaluating the performance of stormwater best management practices (BMPs) such as rain gardens is monitoring, but this approach can involve a long time period to observe a sufficient number and variety of storm events, a high level of effort, and unavoidable uncertainty. In this paper, we describe the development and evaluation of three approaches for performance assessment of rain gardens: visual inspection, infiltration rate testing, and synthetic drawdown testing. Twelve rain gardens in Minnesota underwent visual inspection, with four determined to be nonfunctional based on one or more of the following criteria: (1) presence of ponded water, (2) presence of hydric soils, (3) presence of emergent (wetland) vegetation, and (4) failing vegetation. It is believed that these rain gardens failed due to a lack of maintenance. For the remaining eight rain gardens, an infiltrometer was used to determine the saturated hydraulic conductivity (K_(sat) of the soil surface at several locations throughout each basin in what is termed infiltration rate testing. The median (K_(sat) values for the rain gardens ranged from 3 to 72 cm/h. Synthetic drawdown testing was performed on three rain gardens by filling the basins with water to capacity where possible and recording water level over time. The observed drain times for two of those rain gardens were in good agreement with predictions based on the median of the infiltrometer measurements. The observed drain time for the third rain garden was much greater than predicted due to the presence of a restrictive soil layer beneath the topsoil. The assessment approaches developed in this research should prove useful for determining whether the construction of the rain garden was performed properly, a rain garden is functioning properly, and for developing maintenance tasks and schedules.
机译:评估雨水最佳管理实践(BMP)绩效的最广泛使用的方法(例如雨花园)是监视,但是这种方法可能需要很长时间才能观察到足够数量和种类的暴雨事件,需要付出大量努力,和不可避免的不确定性。在本文中,我们描述了三种评估雨花园性能的方法的开发和评估:外观检查,渗透率测试和合成水落测试。对明尼苏达州的十二个雨花园进行了目视检查,其中四个根据以下一项或多项标准被判定为无效:(1)有积水,(2)有水土,(3)有新芽(湿地)植被;(4)破坏性植被。人们认为,由于缺乏维护,这些雨花园失败了。对于剩下的八个雨水花园,使用渗透仪确定每个盆地中多个位置土壤表面的饱和导水率(K_(sat)),这称为渗透率测试。雨场的速度从3到72 cm / h不等,对三个雨场进行了综合压降测试,方法是在水池中尽可能加满水,并记录一段时间内的水位,观察到的两个雨场的排水时间均良好。根据渗透计测量值的中值与预测结果吻合。由于表层土壤下方存在限制性土壤层,因此第三座雨花园的观测排水时间比预期要长得多。确定是否正确执行了雨花园的建设,雨花园的功能是否正常以及用于制定维护任务和时间表。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号