...
首页> 外文期刊>Journal of the American Water Resources Association >DEVELOPMENT AND APPLICATION OF THE 2010 CHESAPEAKE BAY WATERSHED TOTAL MAXIMUM DAILY LOAD MODEL
【24h】

DEVELOPMENT AND APPLICATION OF THE 2010 CHESAPEAKE BAY WATERSHED TOTAL MAXIMUM DAILY LOAD MODEL

机译:2010年CHEAKEEAKE湾流域最大最大日负荷模型的开发与应用。

获取原文
获取原文并翻译 | 示例
           

摘要

The Phase 5.3 Watershed Model simulates the Chesapeake watershed land use, river flows, and the associated transport and fate of nutrient and sediment loads to the Chesapeake Bay. The Phase 5.3 Model is the most recent of a series of increasingly refined versions of a model that have been operational for more than two decades. The Phase 5.3 Model, in conjunction with models of the Chesapeake airshed and estuary, provides estimates of management actions needed to protect water quality, achieve Chesapeake water quality standards, and restore living resources. The Phase 5.3 Watershed Model tracks nutrient and sediment load estimates of the entire 166,000 km2 watershed, including loads from all six watershed states. The creation of software systems, input datasets, and calibration methods were important aspects of the model development process. A community model approach was taken with model development and application, and the model was developed by a broad coalition of model practitioners including environmental engineers, scientists, and environmental managers. Among the users of the Phase 5.3 Model are the Chesapeake watershed states and local governments, consultants, river basin commissions, and universities. Development and application of the model are described, as well as key scenarios ranging from high nutrient and sediment load conditions if no management actions were taken in the watershed, to low load estimates of an all-forested condition.
机译:5.3期流域模型模拟了切萨皮克流域的土地利用,河流流量以及相关营养物质和沉积物向切萨皮克湾的运输和命运。 5.3版模型是该模型已运行超过二十年的一系列不断完善的版本中的最新版本。 5.3期模型与切塞皮克犬流域和河口模型相结合,提供了保护水质,达到切塞皮克犬水质标准和恢复生活资源所需的管理措施的估计值。 5.3级流域模型跟踪整个166,000 km2流域的营养物和沉积物负荷估算,包括来自所有六个流域州的负荷。软件系统,输入数据集和校准方法的创建是模型开发过程的重要方面。采用了社区模型方法进行模型开发和应用,并且该模型是由包括环境工程师,科学家和环境经理在内的广泛的模型从业者联盟开发的。 5.3阶段模型的用户包括切萨皮克河分水岭州和地方政府,顾问,流域委员会和大学。描述了该模型的开发和应用,以及从高营养盐和沉积物负荷条件(如果在流域不采取任何管理措施的情况下)到低估全森林条件负荷的关键情景。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号