首页> 外文期刊>Journal of the American Water Resources Association >DEVELOPING A NEW OPERATIONS PLAN FOR THE BOW RIVER BASIN USING COLLABORATIVE MODELING FOR DECISION SUPPORT
【24h】

DEVELOPING A NEW OPERATIONS PLAN FOR THE BOW RIVER BASIN USING COLLABORATIVE MODELING FOR DECISION SUPPORT

机译:利用协作模型为决策支持制定弓河盆地新的运营计划

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The Bow River Basin is a cornerstone of Alberta's development. In 2010, stakeholders representing interests from agriculture, municipalities, environment, and more formed the Bow River Project Research Consortium to help determine the potential for improving the operations in the basin. At present, upstream reservoirs are operated primarily for hydropower, whereas downstream reservoirs are operated for irrigation. Through Collaborative Modeling for Decision Support the stakeholders were able to develop a new method for operating the system that would dramatically improve environmental performance. The main components of the new operating strategy called for: purchase or setting aside of a small amount of storage volume in the power reservoirs; a set of rules for releases from that storage; an agreement by the major irrigation districts with the largest water licenses to utilize their ability to shift deliveries to and from their large offstream storage reservoirs to allow for increased instream flows, and to allow junior water license holders (mainly municipal and industrial supplies) an uninterrupted water supply; limitations of reservoir fluctuations to improve inreservoir habitat for fisheries; and increased minimum flows throughout the system leading to improved environmental outcomes. Costs of this strategy were minimal, impacts on power revenue were estimated at
机译:弓河盆地是艾伯塔省发展的基石。在2010年,代表农业,市政当局,环境等利益相关者的利益相关者组成了Bow River项目研究联盟,以帮助确定改善流域作业的潜力。目前,上游水库主要用于水力发电,而下游水库主要用于灌溉。通过决策支持的协作建模,利益相关者能够开发一种新方法来操作系统,从而大大改善环境绩效。新的运营策略的主要组成部分要求:购买或留出蓄能器中少量的存储空间;一组从该存储中释放的规则;具有最大水许可证的主要灌溉区达成的协议,以利用其将输送量移入和移出大型下游储水库的能力,以增加流入流量,并允许初级水许可证持有人(主要是市政和工业供水)供水;限制水库波动以改善渔业水库栖息地;并且增加了整个系统的最小流量,从而改善了环境效果。该策略的成本极低,对电力收入的影响估计平均每年<200万美元。补偿性安排应该是可能的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号