首页> 外文期刊>Journal of Ship Research >Application of Contour Line Method to Estimate Extreme Ship Hull Loads Considering Operational Restrictions
【24h】

Application of Contour Line Method to Estimate Extreme Ship Hull Loads Considering Operational Restrictions

机译:考虑操作限制的等高线法在极限船体载荷估计中的应用

获取原文
获取原文并翻译 | 示例
       

摘要

This paper is concerned with estimating the response value corresponding to a return period, say 100 years. In principle, this response needs to be obtained by combining the response in all the sea states. The response for a given sea state, specified by the significant wave height, H_s, and the peak period, T_p, can be obtained in the frequency domain for the linear response. Time domain simulation is required to obtain the nonlin- ear response, and long time series are required to limit the statistical uncertainty in the simulations.
机译:本文关注于估计与返回期(例如100年)相对应的响应值。原则上,需要通过组合所有海洋状态下的响应来获得此响应。可以在线性响应的频域中获得由有效波高H_s和峰值周期T_p指定的给定海状态的响应。需要时域仿真以获得非线性响应,并且需要长时间序列以限制仿真中的统计不确定性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号