首页> 外文期刊>Journal of Scientific & Industrial Research >Proposed hybrid method of partial extraction
【24h】

Proposed hybrid method of partial extraction

机译:提出的部分提取混合方法

获取原文
获取原文并翻译 | 示例
           

摘要

This paper introduces a hybrid method of partial extraction by combining widely used methods, wide stall method for big pillar and pillar splitting method for small pillar. Stability criteria for proposed method ensures stability and non-violent failure condition of pillar. Numerical simulation of underground coalmine was carried out by finite element method (FEM) and boundary element method (BEM). Coal pillars were simulated by FEM to determine stress-strain behaviour. Coal panel was simulated by BEM to determine local mine stiffness and superimposed load on simulated coal pillars.
机译:通过结合广泛使用的方法,大柱子的宽失速法和小柱子的分裂法,介绍了一种混合的部分提取方法。所提出方法的稳定性标准确保了支柱的稳定性和非暴力破坏条件。利用有限元法和边界元法对地下煤矿进行了数值模拟。煤柱通过有限元模拟,以确定应力应变行为。 BEM对煤板进行了模拟,以确定局部矿山刚度和模拟煤柱上的叠加载荷。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号