首页> 外文期刊>Journal of Scientific & Industrial Research >Optimal common cycle time for a multi-item production system with discontinuous delivery policy and failure in rework
【24h】

Optimal common cycle time for a multi-item production system with discontinuous delivery policy and failure in rework

机译:具有不连续交付策略和返工失败的多物料生产系统的最佳公共周期时间

获取原文
获取原文并翻译 | 示例
           

摘要

This study is concerned with the optimal common cycle time for a multi-item production system with discontinuous delivery and failure in rework. In real life manufacturing environments, managements often plan to produce multiple products in turn on a single machine in order to maximize machine utilization. Also, dealing with random defective items during production seems to be an inevitable task, and the multi-delivery policy is commonly adopted to distribute the finished products to buyers. The objective of this study is to determine the optimal common production cycle that minimizes the total production-inventory-delivery costs per unit time for a multi-item production system with failure in rework and multi-delivery policy. Mathematical modeling along with an optimization procedure is used to derive the optimal common cycle time for the aforementioned production problem.
机译:这项研究涉及具有不连续交付和返工失败的多项目生产系统的最佳公共周期时间。在现实生活中的制造环境中,管理层通常计划在一台机器上依次生产多种产品,以最大程度地提高机器利用率。而且,在生产过程中处理随机的次品似乎是不可避免的任务,并且通常采用多重交付策略将成品分配给买方。这项研究的目的是确定最佳的通用生产周期,以使具有返工和多重交付策略失败的多项目生产系统的每单位时间的总生产库存交付成本最小化。数学建模以及优化过程可用于得出上述生产问题的最佳通用循环时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号