Lean Principles for the Management of Construction Submittals and RFIs

机译:精益求精的施工文件和RFI管理原则

获取原文
获取原文并翻译 | 示例
       

摘要

Office-related processes in the architecture, engineering, and construction (AEC) industry represent a parallel system that works to support activities performed by those in the field, however, researchers often overlook its management. A method to collect and analyze data about submittals was developed using a case study approach, and two cases are presented illustrating an overview of these processes and the use of lean construction concepts to categorize activities and times associated with their different steps. One of the cases sheds light on the reality of how submittals and requests for information (RFIs) are managed in construction projects and indicates that only about a fifth of the submittals in a project are approved as submitted, whereas less than half of them need additional work to be finalized, and over a third need to be revised entirely before they can be accepted and distributed. Opportunities for improvement abound in the management of construction documents and they involve changes/more transparency in the processes used to manage the documents and the need to define indicators to evaluate their performance.
机译:建筑,工程和建筑(AEC)行业中与办公室相关的过程代表了一个并行系统,该系统可支持该领域的人员执行的活动,但是,研究人员常常忽略了其管理。使用案例研究方法开发了一种收集和分析有关提交数据的方法,并提出了两个案例,说明了这些过程的概述以及使用精益施工概念对与不同步骤相关的活动和时间进行分类的方法。其中一个案例说明了在建筑项目中如何管理提交和信息请求(RFI)的现实,并指出项目中只有大约五分之一的提交被批准为提交,而只有不到一半的提交需要尚待完成的工作,三分之一以上的工作需要完全修订,然后才能被接受和分发。施工文件的管理中存在许多改进的机会,其中涉及用于管理文件的过程的更改/更高的透明度,以及需要定义指标来评估其性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号