首页> 外文期刊>Journal of Petroleum Technology >HIGH-PRESSURE COILED TUBING INSTRUMENTAL IN DEEPWATER WELL WORK
【24h】

HIGH-PRESSURE COILED TUBING INSTRUMENTAL IN DEEPWATER WELL WORK

机译:深井作业中的高压油管仪表

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The Troika field is located in the U.S. Gulf of Mexico in 2,700 ft of water. Troika wells are high-rate, high-pressure wells capable of flowing more than 30,000 BOPD and 60 MMscf/D gas. Shut-in tubing pressure is 6,000 psi with produced fluids in the well-bore. Coiled-tubing (CT) operations were performed from a semisubmersible in rough seas with waves as high as 9 ft.
机译:Troika油田位于美国墨西哥湾,海拔2700英尺。 Troika井是高流量高压井,能够输送30,000 BOPD和60 MMscf / D以上的天然气。井筒中有产出液时,关闭管压力为6,000 psi。在波浪高达9英尺的波涛汹涌的大海中,半潜式潜水器进行了连续油管作业。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号