首页> 外文期刊>Journal of operations management >Responding to schedule changes in build-to-order supply chains
【24h】

Responding to schedule changes in build-to-order supply chains

机译:响应按订单生产供应链中的时间表更改

获取原文
获取原文并翻译 | 示例
           

摘要

This multiple case study explores the reaction strategies suppliers use to respond to short-term dynamics of schedule changes in build-to-order supply chains. We examine the relationship and supply chain processes between a notebook computer manufacturer and five component suppliers. Two distinct reaction strategies emerge from these five buyer-supplier dyads. The "reduce uncertainty" strategy emphasizes supply contracts with a high degree of restrictiveness, relatively infrequent schedule revisions, and a high level of form postponement. The "cope with uncertainty" strategy emphasizes flexible supply contracts, relatively frequent schedule revisions, and low levels of form postponement. Eight propositions are formulated to understand the linkage between a supplier's power, its short-term process flexibility, and the elements of its reaction strategy. The paper concludes by proposing future research directions.
机译:这个多案例研究探讨了供应商用来应对按订单生产的供应链中计划变更的短期动态的反应策略。我们研究了笔记本电脑制造商和五个组件供应商之间的关系和供应链流程。这五个购买者-供应商二元组产生了两种不同的反应策略。 “减少不确定性”策略强调供应合同具有高度的限制性,相对较少的时间表修改和高度的形式延迟。 “应对不确定性”策略强调灵活的供应合同,相对频繁的时间表修订以及较低的表格延迟水平。提出了八个命题,以了解供应商的权力,其短期流程灵活性及其反应策略要素之间的联系。本文最后提出了未来的研究方向。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号