首页> 外文期刊>The Journal of Offshore Technology >Accelerating the Hickory schedule
【24h】

Accelerating the Hickory schedule

机译:加快山核桃的进度

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

In the third quarter of this year, operators Anadarko will see the installation of its Hickory and Tanzanite platforms. The engineering/design services for the project were carried out by Houstonbased Paragon Engineering, which designed the deck and topsides using 3D CADD PDMS software. The first installation scheduled is the Tanzanite platform, presently in fabrication at the Aker Gulf Marine yard in Ingleside, Texas. The platform will be on Eugene Island Block 346 in early August. The Hickory platform will then be loaded out, from Gulf Island Fabrication in Houma, Louisiana, destined for Grand Isle Block 116. The Hickory deck weighs 3500t while the Tanzanite deck weighs approximately 4000t. Both the Hickory and Tanzanite platforms are supported by four-legged jackets designed for 324ft and 315ft of water, respectively.
机译:在今年第三季度,运营商Anadarko将看到其Hickory和Tanzanite平台的安装。该项目的工程/设计服务由位于休斯敦的Paragon Engineering提供,该公司使用3D CADD PDMS软件设计了甲板和顶部。预定的第一个安装是Tanzanite平台,目前正在德克萨斯州Ingleside的Aker Gulf船坞制造。该平台将于8月初在Eugene Island 346号区块上。然后,从路易斯安那州侯马的海湾岛制造厂将山核桃平台装载到大岛116号区块。山核桃甲板重3500吨,坦桑石甲板重约4000吨。 Hickory和Tanzanite平台均由分别为324英尺和315英尺的水设计的四脚夹克支撑。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号