...
首页> 外文期刊>Journal of the New England Water Works Association >Executive Summaries on Distribution Topics Presented at the 2018 and 2019 Spring Joint Regional Conference & Exhibition, and the January 2019 Membership Meeting
【24h】

Executive Summaries on Distribution Topics Presented at the 2018 and 2019 Spring Joint Regional Conference & Exhibition, and the January 2019 Membership Meeting

机译:在2018年和2019年春季联合区域会议和展览以及2019年1月会员会议上发表的分销主题摘要

获取原文
获取原文并翻译 | 示例
           

摘要

The Portland Water District (PWD), located in Portland, ME wanted to complete a large scale leak detection program related to several large diameter (16-inch and larger) water transmission mains. The PWD also wanted to investigate the interior condition of the transmission mains for the presence or absence to settled or deposited materials and the visual condition of the internal pipe walls and coatings. The transmission mains ranged in size from 16 to 36-inch, while pipe materials included cast iron, ductile iron and prestressed concrete cylinder pipe.
机译:位于缅因州波特兰的波特兰水域(PWD)希望完成与几个大直径(16英寸及更大)输水主管有关的大规模泄漏检测程序。 PWD还希望调查输电总管的内部状况,以了解是否存在沉淀或沉积的物料,以及内部管道壁和涂层的视觉状况。变速箱的主管道尺寸从16英寸到36英寸不等,而管道材料包括铸铁,球墨铸铁和预应力混凝土圆柱管。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号