首页> 外文期刊>Journal of nature science and sustainable technology >Evaluating the Technical Challenges of River Crossing for the Bakhrabad-Siddhirganj Gas Transmission Pipeline Project
【24h】

Evaluating the Technical Challenges of River Crossing for the Bakhrabad-Siddhirganj Gas Transmission Pipeline Project

机译:评估Bakhrabad-Siddhirganj输气管道项目的过河技术挑战

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

This paper presents the results of a study focused on the recently constructed 60 km X 30 inch Bakhrabad-Siddhirganj gas transmission pipeline. It was laid from Bakhrabad gas field, Comilla, to Siddhirganj power station, Narayanganj. It was commissioned by Gas Transmission Company Limited (GTCL). Despite meticulous planning, the pipeline had to cross six rivers of various depths and widths. Horizontal Directional Drilling (HDD) technology was used for all river crossing projects. This study attempted to categorize the challenges in terms of the nature of the problems and their reasons, frequency, degree of severity etc. The problems identified included the Right-of-Way (ROW), selection of crossing point, sub-soil investigation and selection of work procedure, pipe mis-alignment, delay in rig mobilization, stuck pipe, magnetic interference in pilot hole, and buoyancy control. The challenges and remedial measures of the six projects are briefly discussed in this paper.
机译:本文介绍了一项针对最近修建的60 km X 30英寸Bakhrabad-Siddhirganj输气管道的研究结果。它是从Comilla的Bakhrabad气田铺设到Narayanganj的Siddhirganj电站的。它是由天然气输送有限公司(GTCL)委托进行的。尽管进行了精心的规划,但该管道仍必须跨越六条不同深度和宽度的河流。水平定向钻探(HDD)技术用于所有跨河项目。这项研究试图根据问题的性质及其原因,频率,严重程度等对挑战进行分类。确定的问题包括通行权(ROW),过境点的选择,下层土壤调查和选择工作程序,管道未对准,钻机动员延迟,管道卡死,先导孔中的电磁干扰以及浮力控制。本文简要讨论了这六个项目的挑战和补救措施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号