Project scheduling by incorporating potential quality loss cost in time-cost tradeoff problems: The revised KKH model

机译:项目调度通过在时间 - 成本权衡问题中纳入潜在质量损失成本:修订后的KKH模型

获取原文
获取原文并翻译 | 示例

摘要

Purpose - The study aims to introduce two new models of project scheduling by incorporating potential quality loss cost (PQLC) in time-cost tradeoff problems by overcoming the drawbacks of the existing Kim, Khang and Hwang (KKH) model. The proposed methods are named the Revised KKH-Ⅰ (RKKH-Ⅰ) and Revised KKH-Ⅱ (RKKH-Ⅱ) models for project scheduling. Design/methodology/approach - The performance of the existing KKH model has been tested using a numerical example followed by the identification of the main shortcomings of the KKH method. Later, a concrete effort has been made to address its shortcomings while improving its performance significantly. The comparative analysis of the Revised KKH models with the original model has also been presented along with sensitivity analyses. Findings - The study recognizes that the construct on which the original KKH method was built is important; however, certain drawbacks make it unable to consider PQLC in projects, thus making its practical use questionable. The comparative analysis of the proposed methodology with the original method demonstrated that the new models (RKHH-Ⅰ and Ⅱ) are more comprehensive and intelligent than the existing KKH model. Originality/value - The comparative analysis of the original KKH model and its improved version reveals that the revised model is far more suitable for project scheduling. The study is important for project managers who recognize project scheduling being one of the key parameters associated with project management process, crucial to control every day during the management of projects.
机译:目的 - 研究旨在通过克服现有金,khang和hwang(kKh)模型的缺点,在时间成本的权衡问题中纳入潜在的质量损失成本(PQLC)来引入两个新的项目调度模型。所提出的方法被命名为修正后的KKH-Ⅰ(RKKH-Ⅰ)和修订的KKH-Ⅱ(RKKH-Ⅱ)的项目调度模型。设计/方法/方法 - 使用数字示例进行了现有KKH模型的性能,然后进行了识别KKH方法的主要缺点。后来,已经做出了具体的努力来解决其缺点,同时显着提高其性能。还提出了具有原始模型的经修订的KKH模型的比较分析以及敏感性分析。调查结果 - 该研究认识到,建立原始KKH方法的构建体很重要;然而,某些缺点使其无法考虑PQLC在项目中,因此可以进行实际使用可疑。与原始方法提出的方法的比较分析表明,新模型(RKHH-Ⅰ和Ⅱ)比现有的KKH模型更全面且智能。原创性/值 - 原始KKH模型的比较分析及其改进的版本揭示了修订的模型更适合项目调度。这项研究对于认识到项目调度的项目经理是与项目管理进程相关的关键参数之一,对于项目管理期间每天都对控制的关键参数之一。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号