首页> 外文期刊>Journal of Management in Engineering >Linking the Motivations and Practices of Design Organizations to Implement Building Information Modeling in Construction Projects: Empirical Study in China
【24h】

Linking the Motivations and Practices of Design Organizations to Implement Building Information Modeling in Construction Projects: Empirical Study in China

机译:链接设计组织的动机和实践以在建设项目中实施建筑信息模型:中国的实证研究

获取原文
获取原文并翻译 | 示例
       

摘要

Drawing on institutional theory and the innovation diffusion literature, this paper investigates how design organizations' building information modeling (BIM) implementation practices in construction projects are associated with their BIM implementation motivations and related project contextual factors. These associations are empirically tested with survey data collected from BIM-based construction projects in China, and the examined BIM implementation motivations include image motives, reactive motives, project-based economic motives, and cross-project economic motives. Hierarchical regression analysis results illustrate that design organizations' project BIM implementation practices are significantly impacted by project contextual factors such as client/owner support, and that after controlling for the project contextual factors the higher weights of project-based economic motives and image motives are both significantly associated with higher levels of BIM implementation. By contrast, reactive motives and cross-project economic motives are illustrated to be non-significantly associated with subsequent implementation practices. The findings contribute to deepened understandings of how BIM is tactically implemented by design organizations and why BIM implementation practices in different contexts turn out to be heterogeneous.
机译:利用制度理论和创新扩散文献,本文研究了设计组织在建筑项目中的建筑信息模型(BIM)实施实践如何与其BIM实施动机和相关项目环境因素相关联。这些协会使用从中国基于BIM的建设项目中收集的调查数据进行了经验检验,所考察的BIM实施动机包括图像动机,被动动机,基于项目的经济动机和跨项目的经济动机。分层回归分析结果表明,设计组织的项目BIM实施实践受到项目上下文因素(例如客户/所有者支持)的显着影响,并且在控制了项目上下文因素之后,基于项目的经济动机和图像动机的权重都较高与更高级别的BIM实施显着相关。相比之下,被动动机和跨项目经济动机被说明与后续的实施实践无关紧要。这些发现有助于加深对设计组织如何在策略上实施BIM的理解,以及为何在不同情况下BIM实施实践是异类的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号