...
首页> 外文期刊>Journal of legal affairs and dispute resolution in engineering and construction >Case Study as to the Effectiveness of Dispute Review Boards on the Centra! Artery/Tunnei Project
【24h】

Case Study as to the Effectiveness of Dispute Review Boards on the Centra! Artery/Tunnei Project

机译:关于中央争议审查委员会有效性的案例研究!动脉/隧道项目

获取原文
获取原文并翻译 | 示例

摘要

The most prevalent use of the dispute review board (DRB) process in the United States to date is the central artery/tunnel project located in Boston. A DRB is a three-member panel jointly chosen by the contractor and owner that is present throughout the course of the contract, and whose responsibility it is to hear disputes contemporaneously with their occurrence. This paper reviews the efficacy of the DRB on Ihe central artery/tunnel project answering such questions as to whether or not (I) there was any discernablc bid savings between DRB and non-DRB contracts; (2) the DRB was successful in resolving all disputes prior to contract completion; (3) were there any barriers to the DRB's effectiveness, concerning bid savings; and (4) the DRB reduced the costs of resolving disputes. The questions are timely and important in an industry that looks for new ways to reduce construction costs and values timely prevention and resolution to disputes.
机译:迄今为止,在美国,争议审查委员会(DRB)流程使用最广泛的是波士顿的中央动脉/隧道项目。 DRB是由承包商和业主共同选择的三人小组,在整个合同过程中都在场,其职责是与争议同时发生。本文回顾了DRB在中心动脉/隧道项目中的有效性,回答了以下问题:(I)DRB和非DRB合同之间存在可辨别的投标节省; (2)DRB在合同完成前成功解决了所有争议; (3)在节省标书方面,DRB的有效性是否存在任何障碍; (4)DRB降低了解决争议的成本。这些问题对于寻求减少建筑成本并重视及时预防和解决争端的新方法的行业是及时且重要的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号