...
首页> 外文期刊>Journal of legal affairs and dispute resolution in engineering and construction >Impact of BIM-Related Contract Factors on Project Performance
【24h】

Impact of BIM-Related Contract Factors on Project Performance

机译:与BIM相关合同因素对项目绩效的影响

获取原文
获取原文并翻译 | 示例

摘要

Building information modeling (BIM) implementation is growing in the architecture, engineering, and construction (AEC) industry; however, there is little insight on how contract practices can impact BIM implementation and subsequent project performance. The objective of this research was to evaluate the impact of BIM-related contract practices on project performance. Researchers surveyed the industry on BIM practices, including current contract practices, stakeholders' uses, and the use of BIM execution plans (BEPs). Qualitative comparative analysis was employed to systematically compare cases and identify necessary and sufficient conditions associated with cost success. Researchers found that contractors and subcontractors being contractually required to use BIM and the use of BEP on a project were associated with positive project cost outcomes.
机译:建筑信息建模(BIM)实施在建筑,工程和建筑(AEC)行业中越来越大; 但是,对合同实践如何影响BIM实施和随后的项目性能时几乎没有见解。 本研究的目的是评估与BIM相关的合同实践对项目绩效的影响。 研究人员调查了BIM实践的行业,包括当前的合同惯例,利益相关者的用途以及使用BIM执行计划(BEP)。 在系统地比较案件并确定与成本成本相关的必要和充分条件的定性比较分析。 研究人员发现,承包商和分包商合同使用BIM,并在项目上使用BEP与肯定项目成本结果有关。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号