首页> 外文期刊>Journal of legal affairs and dispute resolution in engineering and construction >Lessons Learned from Selection of Project Delivery Methods in Highway Projects: The Texas Experience
【24h】

Lessons Learned from Selection of Project Delivery Methods in Highway Projects: The Texas Experience

机译:从高速公路项目的项目交付方式选择中学到的经验教训:德州经验

获取原文
获取原文并翻译 | 示例
       

摘要

The effectiveness of a project delivery method selection depends on distinct characteristics, desired goals, institutional constraints, and the correct allocation of risk. The selection of the appropriate method is a complex decision. Within the highway sector, the choice between design-bid-build (D-B-B) and design-build (D-B) delivery methods is one many practitioners are called to make. Researchers and practitioners have developed a number of tools to aid selection. Use of these tools allows empirical investigation to refine our understanding of the factors that guide selection. In particular, this paper uses data from a quantitative tool developed for the Texas Department of Transportation. Since 2014, this tool has been used to select the delivery methods for 57 projects, providing a large data set for analysis. This paper's findings identify the most impactful project characteristics for specific delivery methods, such as site conditions and utility relocations for D-B-B and opportunity for innovation for D-B. Among the project characteristics, those most commonly selected as applicable include potential for early project completion, site conditions, designer-contractor integration, and the contractor being better suited to handle third-party issues. Some strong positive correlations were found among the characteristics relating to opportunities for innovation and the value of designer-contractor integration as well. These findings were validated using importance weightings generated by an expert panel. The quantitative results are useful both for practitioners seeking to refine their project delivery method decision-making and for researchers seeking a quantitative basis for future investigation.
机译:项目交付方法选择的有效性取决于不同的特征,期望的目标,机构约束以及正确的风险分配。选择适当的方法是一个复杂的决定。在高速公路行业中,许多从业人员都要求在设计投标建造(D-B-B)和设计建造(D-B)交付方法之间进行选择。研究人员和从业人员开发了许多工具来辅助选择。使用这些工具可以进行实证研究,以加深我们对指导选择的因素的理解。特别是,本文使用了得克萨斯州交通运输部开发的定量工具中的数据。自2014年以来,该工具已被用于选择57个项目的交付方式,从而为分析提供了大数据集。本文的发现确定了针对特定交付方式的最有影响力的项目特征,例如D-B-B的场地条件和公用事业的位置转移以及D-B的创新机会。在项目特征中,最常被选为可应用的特征包括可能的尽早完成项目,工地条件,设计者与承包商的融合以及承包商更适合处理第三方问题。在与创新机会有关的特征以及设计师与承包商之间的价值之间也发现了一些强烈的正相关关系。使用专家小组生成的重要性权重验证了这些发现。定量结果对于寻求完善其项目交付方法决策的从业者以及寻求定量基础以供将来调查的研究人员都是有用的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号