Case Study on Home Office Overhead Claims

机译:内政部间接费用索赔案例研究

获取原文
获取原文并翻译 | 示例
       

摘要

Time and cost overruns impact the parties to a contract, and often the starting point of disputes and disagreements are associated with likely damages caused by delays. The most contentious aspect related to projects getting delayed is the quantum of claims. Home office overheads (HOOHs) also form one of the claim heads where quantum is disputed. This paper focuses on analysis of unabsorbed HOOH claims through a case study and as awarded in court judgments in India. It evaluates the various ways of calculating such claims and their basis using scenario analysis on the case study, highlighting the difference in their quantum. The study also details discussion on the recent case laws in India for usage, the overhead claims, and the basis for awarding them, including the records capturing factual information relied on by the court for allowing the compensation. The findings identify challenges in using HOOH formulas with scope variations and taking on new projects by the contractors. It also highlights that despite reliance on the Eichleay formula by many courts, there are other formulas that indicate better understanding of scope variation and increase in contractor's revenue through other projects during the delay period. The insight will be helpful to contractors and owners to assess HOOH claims better in the view of scope variations and addition of new projects.
机译:时间和成本超支会影响合同的当事方,通常,纠纷和分歧的起点与延误可能造成的损害有关。与项目延误有关的最有争议的方面是索赔的数量。家庭办公室的管理费用(HOOH)也构成了对量子有争议的索赔目之一。本文着重通过案例研究和印度法院判决中未吸收的HOOH索赔进行分析。它使用案例研究中的情景分析评估了计算此类索赔及其依据的各种方法,突出了它们的数量差异。该研究还详细讨论了印度最近使用的判例法,间接费用索赔以及授予这些费用的依据,包括记录了法院为允许赔偿而依赖的事实信息的记录。研究结果确定了使用范围不同的HOOH公式以及承包商承接新项目的挑战。报告还强调指出,尽管许多法院都依赖Eichleay公式,但还有其他公式可以更好地理解范围变化,并在延迟期内通过其他项目增加承包商的收入。鉴于范围的变化和新项目的添加,这一见解将有助于承包商和业主更好地评估HOOH索赔。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号