首页> 外文期刊>Journal of Intelligent Manufacturing >Load scheduling for multiple quay cranes in port container terminals
【24h】

Load scheduling for multiple quay cranes in port container terminals

机译:港口集装箱码头中多台码头起重机的负荷调度

获取原文
获取原文并翻译 | 示例
           

摘要

This paper proposes a method to schedule loading operations when multiple yard cranes are operating in the same block. The loading scheduling methods in this paper are based on a genetic algorithm and a simulated annealing method, which consider interferences between adjacent yard cranes. It attempts to minimize the make-span of the yard crane operation. We consider the container handling time, the yard crane travel time, and the waiting time of each yard crane, when evaluating the makespan of the loading operation by yard cranes. An encoding method considering the special properties of the optimal solution of the problem is suggested. Numerical experiment was conducted to compare performances of the algorithms suggested in this study.
机译:本文提出了一种在多块起重机在同一街区作业时安排装载作业的计划方法。本文的负荷调度方法是基于遗传算法和模拟退火方法,其中考虑了相邻堆场起重机之间的干扰。它试图最小化院子起重机操作的有效期。在评估堆场起重机的装卸作业时长时,我们会考虑集装箱的装卸时间,堆场起重机的行进时间以及每个堆场起重机的等待时间。提出了一种考虑问题最优解的特殊性质的编码方法。进行了数值实验,以比较本研究中提出的算法的性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号