Review of Compensation Clause for Delay in Handing over of Site in Highway Contracts

机译:审查公路合同现场移交延误补偿条款

获取原文
获取原文并翻译 | 示例
       

摘要

The tender documents are highly legal and technical documents, thus due care is required in preparing these documents. The present standard NHAI tender documents for highway contracts are highly comprehensive documents. The documents meticulously cover all the aspects of highway projects. However, the provisions regarding payment of compensation to contractors on account of delay in handing over of the site/ encumbrance free land, as required for completion of the project, are inadequate. Thus there is a need to upgrade this document by making suitable provisions/amending the existing provision to avoid highly inflated/frivolous claims by the contractors in case of delays in handing over of sites/ encumbrance free land, which are sometimes inevitable.
机译:招标文件是高度合法的技术文件,因此在准备这些文件时需要格外小心。当前的NHAI标准公路合同招标文件是非常全面的文件。这些文件精心涵盖了高速公路项目的所有方面。但是,根据项目完成要求,关于由于延迟交出场地/无保留土地而向承包商支付赔偿的规定不充分。因此,有必要通过做出适当的规定/修改现有的规定来升级本文档,以免承包商在交接场地/无保留土地的延迟情况下有时会不可避免地出现高度虚假/轻描淡写的索赔要求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号