首页> 外文期刊>Journal of the Institution of Engineers (India) >Dam Break Flood Simulation For Maithon And Panchet Dams Using Nws Dambrk Model And Inundation Mapping
【24h】

Dam Break Flood Simulation For Maithon And Panchet Dams Using Nws Dambrk Model And Inundation Mapping

机译:使用Nws Dambrk模型和淹没贴图对Maithon和Panchet大坝的溃坝洪水进行仿真

获取原文
获取原文并翻译 | 示例
       

摘要

Dam break flood simulation of two dams, namely, Panchet and Maithon located on Damodar and Barakar, respectively, river have been performed using NWS DAMBRK model. The. failure of Maithon dam has been simulated and its outflow at the confluence of the two rivers has been considered as lateral inflow, while simulating the failure for Panchet dam over river Damodar. The failure of two dams are simulated under their probable maximum flood (PMF) condition. The maximum discharge, maximum stage and maximum flow velocity and its time of occurrence at various cross-sections along the Damodar and Barakar rivers have been computed. The inundation maps showing the extent, depth and area of inundation have been prepared using GIS software.
机译:使用NWS DAMBRK模型对分别位于Damodar和Barakar的两个大坝Panchet和Maithon进行了溃坝洪水模拟。的。对Maithon大坝的破坏进行了模拟,并在两条河流汇合处的流出被视为横向流入,同时模拟了Damodar河上Panchet大坝的破坏。在大坝可能发生的最大洪水(PMF)条件下模拟了两个大坝的破坏。计算了沿Damodar河和Barakar河不同断面的最大流量,最大水位和最大流速及其发生时间。已使用GIS软件制作了显示淹没程度,深度和面积的淹没图。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号