首页> 外文期刊>Journal of Infrastructure Systems >Incorporating Delay Effects into Airport Runway Pavement Management Systems
【24h】

Incorporating Delay Effects into Airport Runway Pavement Management Systems

机译:将延误效应纳入机场跑道路面管理系统

获取原文
获取原文并翻译 | 示例
       

摘要

This paper presents an approach to address pavement management decision problems at airports with multiple runways. It relaxes some of the underlying assumptions made in previous studies and explicitly considers time requirements for runway reconstruction, deterioration dependence on traffic levels, and the growth of traffic demand over time. A finite-horizon dynamic program is formulated to investigate the interplays among maintenance and repair (M&R) action time, functional interdependence between runways, and traffic growth. Results from computational studies reveal these interplays, in particular the tradeoff between present M&R action and delay cost and long-term benefits brought by significantly upgrading pavement conditions through reconstructing runways. Sensitivity analyses suggest that baseline demand, demand growth rate, and the parameter differentiating traffic-dependent transition probabilities significantly affect optimal M&R decisions and total expected cost to go.
机译:本文提出了一种解决多跑道机场的路面管理决策问题的方法。它放宽了先前研究中的一些基本假设,并明确考虑了跑道重建的时间要求,对交通水平的恶化依赖性以及交通需求随时间的增长。制定了有限水平动态程序,以研究维护和修理(M&R)动作时间,跑道之间的功能相互依赖性以及交通增长之间的相互影响。计算研究的结果揭示了这些相互作用,特别是当前的M&R行动与延误成本之间的权衡,以及通过重建跑道显着改善路面状况而带来的长期利益。敏感性分析表明,基线需求,需求增长率以及区分与交通有关的过渡概率的参数会显着影响最佳的M&R决策和预计的总成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号