...
首页> 外文期刊>Journal of information and computational science >The Optimal Replacement Problem of a Repairable System with Its Repairman Having Multiple Delayed Vacations
【24h】

The Optimal Replacement Problem of a Repairable System with Its Repairman Having Multiple Delayed Vacations

机译:具有多重延迟休假的修理工可修复系统的最优替换问题

获取原文
获取原文并翻译 | 示例
           

摘要

In this paper, a simple repairable system with its repairman having multiple delayed vacations is studied. Assume that the operating time distribution, the consecutive repair time distribution, the vacation time distribution and the delayed vacation time, distribution are all exponential. After repair, the system is not "as good as new". Adopting the replacement policy N which based on the number of failures of the system, we derive the explicit express of the long-run expected cost per unit time. The optimal replacement policy is provided numerically.
机译:在本文中,研究了一个具有多个延迟休假的维修人员的简单可维修系统。假设工作时间分布,连续维修时间分布,休假时间分布和延迟休假时间分布都是指数形式。维修后,该系统“不如新”。采用基于系统故障数的替换策略N,我们得出单位时间的长期预期成本的明确表示。最佳替换策略以数字形式提供。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号