...
首页> 外文期刊>Computers & Industrial Engineering >A replacement policy for a repairable system with its repairman having multiple vacations
【24h】

A replacement policy for a repairable system with its repairman having multiple vacations

机译:可修复系统的替换策略,其中修复程序具有多个休假

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

This paper considers a replacement policy for a repairable system with a repairman, who can have multiple vacations. If the system fails and the repairman is on vacation, it will wait for repair until the repairman is available. Assuming that the system can not be repaired "as good as new" and a repair upon failure can be performed immediately with a probability of p, we optimise replacement policy using geometric processes. The explicit expression of the expected cost rate is derived, and the corresponding optimal policy can be determined analytically or numerically. Finally, a numerical example is given to illustrate the theoretical results of the model.
机译:本文考虑了具有可多次休假的修理工的可修理系统的替换策略。如果系统出现故障并且修理工正在休假,它将等待修理,直到修理工可用为止。假设系统无法“像新的一样好”进行修复,并且可以立即以p的概率对故障进行修复,我们使用几何过程优化了替换策略。得出预期成本率的显式表达式,并且可以通过分析或数字方式确定相应的最佳策略。最后,通过数值例子说明了该模型的理论结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号