首页> 外文期刊>Journal of Hazardous Materials >Pretreatment of landfill leachate using deep shaft aeration bioreactor (DSAB) in cold winter season
【24h】

Pretreatment of landfill leachate using deep shaft aeration bioreactor (DSAB) in cold winter season

机译:在寒冷的冬季使用深井曝气生物反应器(DSAB)预处理垃圾渗滤液

获取原文
获取原文并翻译 | 示例
           

摘要

A pilot-scale deep shaft aeration bioreactor (DSAB) with 110 m in depth and 0.5 m in diameter for the pretreatment of landfill leachate in winter was operated at a daily treatment scale of around 10-20 tons. It was found that the performance of the DSAB mainly depended on the inflow loads and concentrations of pollutants. NH_3-N, TN, COD, TOC removals of 66-94%, 41 -64%, 67-87%, 55-92% at organic load rate of 1.7-9.4 g CODL~(-1) day~(-1) and hydraulic retention time of 1-2 d were obtained using DSAB, respectively, with the lowest ambient temperature of-3℃. The effluent COD can be reduced to below 1000 mg/L, an acceptable level for advanced treatment using reverse osmosis system, when the influent COD was below 7000 mg/L at 10t/d. The EEM and GPC analysis implied that the non-biodegradable contaminants such as humic- and fulvic-like DOM dominated in the organic fractions of the effluent, which rendered the biological treatment ineffective. Compared with 20-40% removals obtained using traditional biological processes below 15 ℃, DSAB showed a higher treatment efficiency for COD and NH_3-N, even though at adverse conditions of poor carbon source, lower C/N ratio and high nitrite concentrations in the leachate of test.
机译:深度为110 m,直径为0.5 m的中试深度深井曝气生物反应器(DSAB),用于冬季的垃圾渗滤液的预处理,日处理规模约为10-20吨。发现DSAB的性能主要取决于流入量和污染物浓度。在1.7-9.4 g CODL〜(-1)天〜(-1)的有机负荷下,NH_3-N,TN,COD,TOC去除率分别为66-94%,41 -64%,67-87%,55-92% )和最低水温为-3℃的DSAB分别获得1-2 d的水力停留时间。当进水的COD在10t / d时低于7000 mg / L时,出水的COD可以降至1000 mg / L以下,这是使用反渗透系统进行深度处理的可接受水平。 EEM和GPC分析表明,不可生物降解的污染物(如腐殖质和黄腐型DOM)在废水的有机部分中占主导地位,这使生物处理无效。与在15℃以下使用传统生物工艺​​获得的20-40%的去除相比,DSAB对COD和NH_3-N的处理效率更高,即使在恶劣的碳源,较低的C / N比和较高的亚硝酸盐浓度的不利条件下也是如此。测试渗滤液。

著录项

  • 来源
    《Journal of Hazardous Materials》 |2013年第15期|250-257|共8页
  • 作者单位

    The State Key Laboratory of Pollution Control and Resource Reuse, School of Environmental Science and Engineering,Tongji University. Shanghai 200092,China;

    Shanghai Cuanglian Construction Development Co. Ltd., Shanghai, China;

    Shanghai Cuanglian Construction Development Co. Ltd., Shanghai, China;

    Shanghai Laogang Waste Treatment Company, Shanghai 201302, China;

    Shanghai Laogang Waste Treatment Company, Shanghai 201302, China;

    The State Key Laboratory of Pollution Control and Resource Reuse, School of Environmental Science and Engineering,Tongji University. Shanghai 200092,China;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Deep shaft; Aeration; Landfill leachate; Low temperature; Pretreatment;

    机译:深井;通风;垃圾渗滤液低温;预处理;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号