...
首页> 外文期刊>Journal of green building >MONITORING CARBON EMISSIONS IN PRECAST CONCRETE INSTALLATION THROUGH LEAN PRODUCTION - A CASE STUDY IN SINGAPORE
【24h】

MONITORING CARBON EMISSIONS IN PRECAST CONCRETE INSTALLATION THROUGH LEAN PRODUCTION - A CASE STUDY IN SINGAPORE

机译:通过精益制作监测预制混凝土安装中的碳排放 - 以新加坡为例

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The lean philosophy focuses on eliminating waste and maximizing productivity through the pull system, employee involvement, continuous improvement, etc. Much has been discussed about the waste elimination and productivity improvement that can be achieved by applying the lean concept. However, as the consideration of the environment is becoming an increasingly important part of the construction culture, there is a need to investigate the applicability of the lean concept to achieve environmental sustainability, which is often used interchangeably with the term "green". This research therefore aims to investigate the contribution of the lean concept to achieve low-carbon installation in precast concrete construction sites through a case study in Singapore. The life cycle assessment (LCA) results show that the lean concept can be adopted to reduce carbon emissions in terms of eliminating waste and inappropriate erection arrangements. In the installation cycle of a specific type of precast concrete column, an amount of 20.9kg carbon emissions (71.0%) is caused by wastes and inappropriate erection arrangements and can be reduced by applying lean principles through a detailed simulation. Many lean management practices in site layout, delivery, stock and erection management are identified in this paper. Based on the results, contractors can start to apply lean principles to improve the installation cycle and eventually achieve low-carbon installation.
机译:精益哲学专注于消除浪费,通过拉动系统,员工参与,持续改进等最大化生产力。已经讨论了通过应用精益概念来实现的废物消除和生产率改进。然而,由于对环境的思考正成为建筑文化的越来越重要的部分,需要调查精益概念的适用性,以实现环境可持续性,这通常与“绿色”一词互换使用。因此,这项研究旨在通过新加坡的案例研究来研究精益概念在预制混凝土建筑工地实现低碳安装的贡献。生命周期评估(LCA)结果表明,精益概念可以采用以减少消除浪费的碳排放和不适当的勃起安排。在特定类型的预制混凝土柱的安装周期中,碳排放量为20.9kg碳排放量(71.0%)是由废物引起的,并且通过详细仿真应用精益原理可以减少。本文确定了现场布局,交付,库存和勃起管理的许多精益管理实践。根据结果​​,承包商可以开始应用精益原则以改善安装周期,最终实现低碳安装。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号