Forensic Geotechnical Analyses on the 2009 Building-Overturning Accident in Shanghai, China: Beyond Common Recognitions

机译:中国上海2009年建筑推翻事故的法医岩土工程分析:超越共同承认

获取原文
获取原文并翻译 | 示例
       

摘要

To date, why a 13-story building in Shanghai fell abruptly to the ground in 2009 remains uncertain. By review of physical evidence, limit-equilibrium analyses, extensive calculations, and three-dimensional numerical simulations, this study reveals that the failure arose from a rainfall-triggered undrained general shear failure of the subgrade underneath the adjacent stockpile rather than previously identified lateral ground movement shearing off piles below the building or failure of piles along the excavation side incurring progressive tilting failure of the building. Deep-seated slip failure of the stockpile applied an impact load on the building and immediately produced an unallowable overturning moment around the south building edge; consequently, the building suddenly fell over southward. Furthermore, the following vital phenomena, which received no attention in the previous investigations, are also explored: (1) how this building fell over but an adjacent building subjected to similar conditions did not; (2) how this building supported by piles fell over but a flood wall supported by shallow foundation remained intact, although both were near a 10-m-high stockpile; and (3) how the flood wall near the 10-m-high stockpile remained intact but the flood wall near a 6-m-high stockpile underwent catastrophic failure. Finally, some design and construction issues involved in this failure case are discussed.
机译:迄今为止,为什么上海一座13层楼的建筑于2009年突然下跌,仍然不确定。通过审查物理证据,限制平衡分析,广泛的计算和三维数值模拟,揭示了在相邻库存下方的降雨引发的降雨的未推发的未经训练的一般剪切失效而不是先前识别的横向地面在挖掘侧发生挖掘侧的建筑物下方的桩或桩的故障剪切剪切桩。储存的深防滑失效应用于建筑物上的冲击载荷,并立即产生围绕南部建筑边缘的不允许翻转时刻;因此,建筑突然落在南方。此外,还探讨了以下几乎没有注意到的重要现象,也探讨了:(1)这座建筑物如何落下,但毗邻相似条件的相邻建筑物没有; (2)这座建筑用桩支撑的建筑物结束,但浅基金会支持的洪水墙保持完整,尽管两者都在储存10米高的储存; (3)10米高股票附近的洪水墙如何完整,但洪水靠近6米高的储存造成的灾难性失败。最后,讨论了这种故障案件中涉及的一些设计和施工问题。

著录项

  • 来源
    《Journal of geotechnical and geoenvironmental engineering》 |2020年第7期|05020005.1-05020005.26|共26页
  • 作者单位

    Dept. of Geotechnical Engineering College of Civil Engineering Tongji Univ. 1239 Sipping Rd. Shanghai 200092 China;

    Dept. of Geotechnical Engineering College of Civil Engineering Tongji Univ. 1239 Sipping Rd. Shanghai 200092 China;

    Dept. of Geotechnical Engineering College of Civil Engineering Tongji Univ. 1239 Sipping Rd. Shanghai 200092 China;

    Dept. of Civil Engineering Shanghai Univ. 99 Shang-Da Rd. Shanghai 200444 China;

    Shanghai Geotechnical Investigation and Design Institute Engineering Consulting (Group) Co. Ltd. 180 Shu-Feng Rd. Shanghai 200032 China;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Building; Excavation; Stockpile; Earth retaining wall; Foundations; Failure; Investigation;

    机译:建造;挖掘;储存;地球挡土墙;基础;失败;调查;
  • 入库时间 2022-08-18 21:41:26

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号