首页> 外文期刊>Journal of Ferrocement >CRACK CONTROL OF REINFORCED CONCRETE MEMBERS USING FERROCEMENT TENSION ZONE LAYER
【24h】

CRACK CONTROL OF REINFORCED CONCRETE MEMBERS USING FERROCEMENT TENSION ZONE LAYER

机译:钢筋张力带层对钢筋混凝土构件的裂缝控制

获取原文
获取原文并翻译 | 示例
           

摘要

This paper presents a study on crack control of reinforced concrete slabs and beams using ferrocement tension zone layer. The results of tests on fourteen simply supported slabs and beams are presented. The investigated parameters were type and spacing of shear connectors and percentage of reinforcement in the ferrocement layer. The results indicate that the use of ferrocement tension zone layer has increased the first crack load by 17%-83% in slabs and by 50%-93% in beams. Average crack width reduced by 70%-74% in slabs and by 26%-77% in beams when compared with their control specimens. Average number of cracks almost doubled in slabs and increased by 10% in beams, whereas average spacing of cracks reduced by 25% in slabs and by 11% in beams. Increasing the spacing of shear connectors from 300mm to 600mm in beams or from 350mm to 700mm in slabs seemed to have negligible effect on the over all behaviuor of the tested specimens. Composite action was achieved with all methods of connection up to failure.
机译:本文研究了利用钢筋混凝土拉力带层控制钢筋混凝土板和梁的裂缝的方法。给出了在14个简单支撑的平板和梁上的测试结果。研究的参数是剪切连接器的类型和间距以及在铁锈层中的钢筋百分比。结果表明,使用钢筋混凝土拉力带层使平板的初次裂纹荷载增加了17%-83%,梁增加了50%-93%。与对照样品相比,平板的平均裂缝宽度减少了70%-74%,梁减少了26%-77%。平板的平均裂缝数几乎翻了一番,梁中增加了10%,而平板的平均裂缝间距减少了25%,梁中减少了11%。将梁的剪切连接器的间距从300mm增加到600mm,将平板的剪切连接器的间距从350mm增加到700mm,似乎对测试样品的整体性能影响很小。使用所有连接方法直至失败,都可以实现复合操作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号