首页> 外文期刊>Journal of Facilities Management >Output-based specifications for PPP projects: lessons for facilities management from Australia
【24h】

Output-based specifications for PPP projects: lessons for facilities management from Australia

机译:PPP项目基于产出的规范:来自澳大利亚的设施管理课程

获取原文
获取原文并翻译 | 示例
       

摘要

Purpose - The purpose of this paper is to focus on the challenges faced by the public and private sectors in developing output specifications for Australian public private partnership (PPP) projects. In particular, this study aims to examine how the stakeholders (including facilities managers) should cater for future changes in output specifications and make them flexible enough to meet the evolving project objectives. Design/methodology/approach - The research is based on 19 semi-structured interviews with key stakeholders from the public and private sectors in three States of Australia where PPP procurement has been used, including New South Wales (NSW), Queensland and Victoria. The results are triangulated with relevant literature for supports and contrasts. Findings - For PPP projects, a good set of output specifications is conducive to the achievement of value for money, innovation, risk transfer, whole life asset performance through a clear abatement regime and an effective linkage of performance criteria to the payment mechanism. For existing specifications, it was found that too many and complex KPIs were specified, which were difficult to monitor, measure and implement by the client. Very prescriptive specifications hindered innovations and did not allow appropriate risk allocation. Further, the research study suggests that after the global financial crises, the private sector had less appetite to take the patronage risks in road and rail PPP projects. To mitigate these pitfalls, it is imperative that output specifications need to be aligned with the type of PPP projects they represent; in particular foreseeable changes should be addressed by some pre-agreed framework to facilitate negotiation. Originality/value - The significant contribution of this research is the identification of the common issues faced in drafting output specifications for Australian PPP projects. Stakeholders of future PPP projects should find the lessons useful for achieving value for money and appropriate risk transfer, stating the user requirements through clear and concise output specifications rather than input or prescriptive specifications in procuring social and economical PPP projects. Their relationships with facilities management are highlighted.
机译:目的-本文的目的是着眼于公共和私营部门在制定澳大利亚公私伙伴关系(PPP)项目的产出规格时面临的挑战。尤其是,本研究旨在研究利益相关者(包括设施管理者)应如何满足产出规格的未来变化,并使它们具有足够的灵活性以实现不断变化的项目目标。设计/方法/方法-这项研究是基于对来自三个已使用PPP采购的澳大利亚三个州(包括新南威尔士州(NSW),昆士兰州和维多利亚州)的公共部门和私营部门的主要利益相关者进行的19次半结构化访谈而进行的。结果与相关文献进行了三角剖分,以提供支持和对比。调查结果-对于PPP项目,一套好的输出规范有助于通过明确的减排制度以及将绩效标准与支付机制有效地联系起来,实现物有所值,创新,风险转移,终身资产的绩效。对于现有规范,发现指定了太多且复杂的KPI,这些KPI很难由客户端进行监视,度量和实施。规范性很强的规范阻碍了创新,也没有适当地分配风险。此外,研究还表明,在全球金融危机之后,私营部门对公路和铁路PPP项目中的光顾风险的承受力较小。为了减轻这些缺陷,当务之急是必须使产出规格与其所代表的PPP项目的类型保持一致。尤其是可预见的变化应通过一些预先商定的框架来解决,以促进谈判。原创性/价值-这项研究的重要贡献是确定了澳大利亚PPP项目产出规范起草中面临的常见问题。未来PPP项目的利益相关者应该找到对实现物有所值和适当风险转移有用的课程,在采购社会和经济PPP项目时,通过清晰简明的输出规范(而非输入或说明性规范)说明用户要求。他们与设施管理的关系得到了强调。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号