...
机译:菲律宾马尼拉大都会采用基于实用程序的递归证据推理方法进行结构性洪灾缓解措施的环境影响评估
Department of Civil and Environmental Engineering, Tokyo Metropolitan University, 1-1 Minami-Ohsawa, Hachioji, Tokyo 192-0397, Japan;
Department of Civil and Environmental Engineering, Tokyo Metropolitan University, 1-1 Minami-Ohsawa, Hachioji, Tokyo 192-0397, Japan;
Woodfields Consultants, Inc., 153 Kamias Road Extension, Kamias, Quezon City 1102, Philippines;
Department of Civil and Environmental Engineering, Tokyo Metropolitan University, 1-1 Minami-Ohsawa, Hachioji, Tokyo 192-0397, Japan;
Department of Civil and Environmental Engineering, Tokyo Metropolitan University, 1-1 Minami-Ohsawa, Hachioji, Tokyo 192-0397, Japan;
EIA; Rapid impact assessment matrix; Evidential reasoning; Structural flood mitigation measures; Metro Manila;
机译:快速影响评估矩阵(RIAM)技术对结构性防洪措施的环境影响评估:以菲律宾首都马尼拉为例
机译:结构性减灾措施的环境影响评估:以斯洛伐克锡巴为例
机译:菲律宾马尼拉大都会街头儿童,城市贫困人口和富裕社区居民对洪水危害的不同影响
机译:菲律宾马尼拉大都会河道变更减洪过程中的水质评估
机译:缓解终端湖洪水的环境影响:以北达科他州的魔鬼湖为例
机译:早期评估减缓措施对控制Covid-19在22个法国大都市区的影响10月至11月20日
机译:利用快速影响评估矩阵(RIAM)技术对菲律宾地铁山马尼拉洪水缓解结构的环境评估
机译:填海:管理西方的水资源。对堤防5场地通道和道路改道以及辅助溢洪道消力池围堰没有显着影响的发现。对Folsom大坝安全和洪水灾害减少的最终补充环境评估。最终环境影响报告/环境影响报告