首页> 外文期刊>Journal of Environmental Assessment Policy and Management (JEAPM) >BEFORE EIA: DEFINING THE SCOPE OF INFRASTRUCTURE PROJECTS IN THE NETHERLANDS
【24h】

BEFORE EIA: DEFINING THE SCOPE OF INFRASTRUCTURE PROJECTS IN THE NETHERLANDS

机译:在EIA之前:定义荷兰基础设施项目的范围

获取原文
获取原文并翻译 | 示例
       

摘要

This article discusses recent developments in integrated planning for the national road infrastructure in the Netherlands. It lays emphasis on project definition as a "missing link" between strategic planning and operational planning.nnRoad development projects may have considerable negative impacts. Projects, however, are often too narrowly focused on road (re)construction alternatives and pay too less attention to the relationships with other spatial developments. As a consequence, the scope of project Environmental Impact Assessments (EIAs) is too narrow and opportunities are missed to enhance the spatial and environmental quality of the regions concerned. These problems are best tackled early in the planning process when the "degrees of freedom" in shaping the project are relatively large.nnUsing the case of the A27 motorway a new guideline for explorative studies is introduced. The instrument described (called "reconnaissance study") aims to connect the planning arenas of Strategic Environmental Assessment and EIA, thus achieving more sustainable planning. It focuses on the early stage of project development in which the scope of projects is defined by "zooming in" from the national to a regional setting and translation of abstract policy goals to a "real world" situation. Key elements are a transparent process in which problem analysis and development of solutions are seperated, involvement of external parties and a broad study scope.
机译:本文讨论了荷兰国家道路基础设施综合规划的最新发展。它强调将项目定义作为战略计划和运营计划之间的“缺失环节”。nn道路开发项目可能会产生相当大的负面影响。但是,项目通常过于狭窄地专注于道路(重建)替代方案,而对与其他空间开发的关系的关注却很少。结果,项目环境影响评估(EIA)的范围太狭窄,错过了提高有关地区的空间和环境质量的机会。这些问题最好在规划过程的早期就解决,因为在塑造项目时“自由度”相对较大。以A27高速公路为例,引入了新的探索性研究指南。所描述的工具(称为“勘查研究”)旨在将战略环境评估和EIA的规划领域联系起来,从而实现更具可持续性的规划。它侧重于项目开发的早期阶段,在该阶段中,项目范围是通过从国家到区域设置的“放大”来定义的,并将抽象的政策目标转换为“现实世界”的情况。关键要素是一个透明的过程,其中问题的分析和解决方案的开发是分开的,外部各方的参与和广泛的研究范围。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号