首页> 外文期刊>Journal of Energy Storage >Real-world operating strategy and sensitivity analysis of frequency containment reserve provision with battery energy storage systems in the german market
【24h】

Real-world operating strategy and sensitivity analysis of frequency containment reserve provision with battery energy storage systems in the german market

机译:德国市场上使用电池储能系统提供频率限制储备的实际操作策略和敏感性分析

获取原文
获取原文并翻译 | 示例
           

摘要

Large-scale battery energy storage systems (BESS) have become increasingly interesting to provide ancillary services for the electricity grid. Especially the German frequency containment reserve (FCR) market which is organized by the German transmission system operators (TSO) is attractive for BESS. Because of its importance for the system stability, FCR has to be provided continuously with 100% availability. Due to the limited energy capacity of BESS, an operating strategy is required to enable continuous FCR provision. The German TSOs have defined several requirements that BESS have to comply with as well as degrees of freedom (DoF) to enable corrective measures such as selective recharging for an operating strategy. This paper presents a sensitivity analysis of different operational parameters based on an operating strategy developed within the M5BAT (Modular Multi_Megawatt Multi-Technology Medium-Voltage Battery Energy Storage System) project. Within this project the construction and operation of a 5 MW hybrid BESS with five different battery technologies is realized. As this BESS will mainly be operated in the German FCR market, it is used as reference for this paper. The developed operating strategy considers the TSO's FCR requirements and DoF and is fully applicable to the German FCR market. Within this paper it is explained how corrective measures have to be triggered in order to comply with the requirements. A model of the M5BAT BESS, which comprises various battery technologies and an energy management system (EMS) for load allocation among multiple battery strings, is introduced. Simulations of FCR operation with measured frequency data of the year 2014 are presented. The influence of the lead time and duration of corrective measures, the EMS and the FCR requirements on compliance with the FCR requirements, amount of corrective measures, resulting energy throughput, state-of-energy (SOE) distributions and cycle numbers are investigated. The results show a significant impact of all parameters. It is found that velocity and flexibility of corrective measures (e.g. recharging) and an efficient EMS are prerequisites for FCR operation with BESS under the applicable regulation. Additionally, the results indicate that the overall benefits of FCR provision with BESS could be improved with an adjustment of the requirements (30-min-criterion).
机译:大型电池储能系统(BESS)为电网提供辅助服务变得越来越有趣。特别是由德国传输系统运营商(TSO)组织的德国频率限制储备(FCR)市场对BESS有吸引力。由于它对系统稳定性很重要,因此必须连续提供FCR,并提供100%的可用性。由于BESS的能源容量有限,因此需要一种操作策略来实现连续FCR的提供。德国的TSO定义了BESS必须遵守的几个要求以及自由度(DoF),以采取纠正措施,例如针对运营策略进行选择性充电。本文基于M5BAT(模块化多兆瓦多技术中压电池储能系统)项目中开发的运行策略,介绍了不同运行参数的灵敏度分析。在该项目中,实现了具有五种不同电池技术的5 MW混合BESS的建设和运营。由于该BESS主要在德国FCR市场上运行,因此可作为本文的参考。制定的运营策略考虑了TSO的FCR要求和D​​oF,并且完全适用于德国FCR市场。在本文中,解释了如何触发纠正措施以符合要求。介绍了M5BAT BESS的模型,该模型包括各种电池技术和一个能量管理系统(EMS),用于在多个电池组之间分配负载。提出了使用2014年实测频率数据对FCR运行进行的仿真。研究了提前期和纠正措施的持续时间,EMS和FCR要求对符合FCR要求,纠正措施的数量,产生的能量通过量,能量状态(SOE)分布和循环次数的影响。结果显示了所有参数的显着影响。发现在适用法规下,采取纠正措施(例如充电)的速度和灵活性以及有效的EMS是使用BESS进行FCR操作的先决条件。此外,结果表明,通过调整需求(30分钟标准),可以改善BESS提供的FCR的总体收益。

著录项

  • 来源
    《Journal of Energy Storage》 |2017年第10期|143-163|共21页
  • 作者单位

    Institute for Power Generation and Storage Systems (PGS), E.ON ERC, RWTH Aachen University, Germany,Jülich Aachen Research Alliance, JARA-Energy, Germany;

    Institute of Power Systems and Power Economics (IAEW), RWTH Aachen University, Germany,Jülich Aachen Research Alliance, JARA-Energy, Germany;

    Institute of Power Systems and Power Economics (IAEW), RWTH Aachen University, Germany,Jülich Aachen Research Alliance, JARA-Energy, Germany;

    Institute of Power Systems and Power Economics (IAEW), RWTH Aachen University, Germany,Jülich Aachen Research Alliance, JARA-Energy, Germany, Institute for Power Generation and Storage Systems (PGS), E.ON ERC, RWTH Aachen University, Germany,Jülich Aachen Research Alliance, JARA-Energy, Germany;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Ancillary services; Battery energy storage systems; Frequency containment reserve; Operation strategy; Primary frequency control; Sensitivity analysis;

    机译:辅助服务;电池储能系统;频率限制储备;经营策略;初级频率控制;敏感性分析;