...
首页> 外文期刊>Journal of Constructional Steel Research >Comparison of detailing methods for straight skewed steel I-girder bridges
【24h】

Comparison of detailing methods for straight skewed steel I-girder bridges

机译:直斜钢工字梁桥的详图方法比较

获取原文
获取原文并翻译 | 示例
           

摘要

The effects of support in steel bridges can present significant challenges during construction. The tendency of the girder to twist or layover during the placement of the deck can present a particularly challenging problem regarding detailing the cross-frames that provide bracing to the steel girders. There are generally three alternatives regarding the detailing for the cross-frames to achieve an approximate plumb condition of the webs: 1) detailing for no load fit, 2) detailing for steel dead load fit, or 3) detailing for total dead load fit. In the past, different detailing methods have been investigated to identify and compare structural responses affected by the detailing methods. However, the use of wrong camber diagrams in these studies lead to erroneous calculations of structural responses for total dead load fit.
机译:钢桥中的支撑作用可能会在施工过程中提出重大挑战。在放置甲板期间,大梁的扭曲或搁置的趋势可能会带来一个特别具有挑战性的问题,那就是详细说明为钢梁提供支撑的横梁。关于横框架的细节,通常存在三种选择,以实现腹板的近似铅垂状态:1)无负载配合的细节,2)钢静载荷配合的细节或3)总静载荷配合的细节。过去,已经研究了不同的详细设计方法以识别和比较受详细设计方法影响的结构响应。但是,在这些研究中使用错误的弯度图会导致总静载荷拟合的结构响应计算错误。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号