Behaviour of riveted stringer-to-floorbeam connections in cyclic load tests to failure

机译:铆接纵梁到地板连接在循环载荷试验中的行为

获取原文
获取原文并翻译 | 示例

摘要

Structural connections in bridges supporting directly the railway track have cumulated large amount of load cycles from passing trains. The connections were not originally designed for fatigue and some of them have found to be in poor condition by inspection. To study their structural behaviour under large number of repeated load cycles, five 85 year old stringer-to-floorbeam connections from a decommissioned railway bridge were loaded in laboratory. Each connection had four angle plates connecting stringer webs to floorbeams and two connection plates connecting stringer top flanges together. During the load tests, the connection plate maximum stress ranged from 60 MPa to 150 MPa. It was estimated that the peak stresses under traffic were in the range of 40-60 MPa. Despite large stresses in load tests and long active use under traffic, only three connections failed after 0.5-1.6 million load cycles. Two connection tests were run out after 2.4 and 2.6 million cycles. By measuring strains and displacements continuously during testing it was seen that failures occurred gradually as components fractured slowly during tens of thousands of cycles. Any of the connection failures was not complete and the connections showed substantial residual bending stiffness and capacity after failure. Load tests showed that even if connection is seen to be in poor condition and close to its theoretical fatigue life, it still might function safely for hundreds of thousands of stress cycles if stress redistribution between connection components is possible and connection is monitored for major fractures. (C) 2019 Elsevier Ltd. All rights reserved.
机译:直接支撑铁路轨道的桥梁中的结构连接具有通过列车的大量负载循环。这些连接最初是针对疲劳设计的,其中一些人发现通过检查是糟糕的状态。为了在大量重复的负载周期下研究它们的结构行为,在实验室中加载了来自退役的铁路桥的五个85岁的血管到地板连接。每个连接都有四个角度平板将纵梁腹板连接到地板上,两个连接板连接在一起连接纵梁顶部凸缘。在负载测试期间,连接板的最大应力范围为60MPa至150MPa。据估计,交通下的峰值应力在40-60MPa的范围内。尽管负载测试和长期积极使用的大量压力,但在0.5-16万负载周期后,只有三个连接失败。在2.4和260万次周期之后,两个连接测试被用完。通过在测试期间连续测量菌株和位移,看来由于在成千上万的循环期间的组件缓慢地断裂而发生故障。任何连接故障都没有完成,并且连接在发生故障后的连接显示出大量的残余弯曲刚度和容量。负载测试表明,即使连接状态差,靠近其理论疲劳寿命,它仍然可以在可能的连接部件之间的应力再分布并且监测主要裂缝的连接,安全地仍然可以安全地发挥成千上万的应力循环。 (c)2019 Elsevier Ltd.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号