Construction mismanagement results in multiple problems that can cascade throughout the work force chain, affecting the schedule and leading to damages to multiple parties. Although the problem may start with a single subcontractor, it can result in all contractors feeling some impact to their work. In this paper, a case study is presented of a project with seven different mismanagement scenarios. A description of each scenario is provided as well as a quantification of the damages that result from the problem. A construction claims section is also included that addresses many of the issues that could result from a claim for each of the seven scenarios. A discussion is presented outlining possible preventative steps to minimize the damages from the problems presented.
机译:施工管理不善会导致多种问题,这些问题会在整个劳动力链中层出不穷,影响进度,并导致对多方的损害。尽管问题可能始于单个分包商,但它可能导致所有承包商对其工作产生某种影响。在本文中,将对一个案例进行研究,该案例具有七个不同的管理不善情形。提供了每种情况的描述以及由问题导致的损害的量化。还包括一个“施工索赔”部分,该部分解决了可能针对这七个方案中的每一个索赔引起的许多问题。进行了讨论,概述了可能的预防步骤,以最大程度地减少所提出问题的损害。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号